Complete the renovation specification

Completion instructions for renovation specification

If you need an appraisal of your house that requires a renovation, we need a renovation specification. You can download the renovation specification here link, the specification is always sent with the appointment confirmation or you will receive the form from your mortgage advisor.

We receive many questions or incorrectly completed renovation specifications. That is why we have created instructions so that you can easily complete the form.

#TIP 1 When you fill out the form digitally, it automatically adds up all amounts. That saves a lot of math!

Step 1

Enter your details under “Applicant details”. Then enter the “Object details” where you enter the address of the object that needs to be valued.

part 1 renovation specification

Step 2

Under the heading “Renovation / improving the existing situation”, this concerns general home improvements. Consider replacing the bathroom, kitchen or toilet. But also applying a new floor finish, painting the walls or creating a new garden.

In the “Description” you fill in what the work will entail for each part.

Choose option 1 or 2. It is important that you indicate whether you will carry out the work yourself or which work is necessary.

Option 1 = Perform work yourself. These are the tasks that you will actually have to carry out yourself. For example, painting a wall or laying a laminate floor. This does not include work carried out by a contractor.
Option 2
= immediately necessary maintenance. Work that must be carried out subject to the home. For example, painting the outside of the house or replacing a bathroom because the existing bathroom is leaking.
You do not have to fill in these options if the work is carried out by a contractor!

In the last column “Amounts” enter the amount you have budgeted for or the amounts from the contractor's quotation.

part 2 renovation specification

Step 3

Under the heading “Structural adjustments / extensions” under “Work”, enter which work will take place, such as installing an extension, roof structure or a dormer window. Also enter the dimensions, this may affect the square meters after renovation.

Choose option 1 or 2. It is important that you indicate whether you will carry out the work yourself or which work is necessary.

Option 1 = Perform work yourself. These are the tasks that you will actually have to carry out yourself. For example, painting a wall or laying a laminate floor. This does not include work carried out by a contractor.
Option 2
= immediately necessary maintenance. Work that must be carried out subject to the home. For example, painting the outside of the house or replacing a bathroom because the existing bathroom is leaking.
You do not have to fill in these options if the work is carried out by a contractor!

In the last column “Amounts” enter the amount you have budgeted for or the amounts from the contractor's quotation.

part 3 renovation specification

Step 4

The fourth part of the renovation specification concerns energy-saving measures.

Under the heading “Energy saving measures” under “Work”, enter which work will take place, such as installing a heat pump, HR++ glass or solar panels. When installing solar panels, enter how many panels will be installed.

Choose option 1 or 2. It is important that you indicate whether you will carry out the work yourself or which work is necessary.

Option 1 = Perform work yourself. These are the tasks that you will actually have to carry out yourself. For example, painting a wall or laying a laminate floor. This does not include work carried out by a contractor.
Option 2
= immediately necessary maintenance. Work that must be carried out subject to the home. For example, painting the outside of the house or replacing a bathroom because the existing bathroom is leaking.
You do not have to fill in these options if the work is carried out by a contractor!

In the last column “Amounts” enter the amount you have budgeted for or the amounts from the contractor's quotation.
If the house is completely renovated to a “zero-on-the-meter” house, then you only tick that box.

part 4 renovation specification

Step 5

The last step of the completion instructions for the renovation specification is to check all total amounts and place the date and signature.

part 5 renovation specification

We explain in 5 steps how to complete the renovation specification.

If you can't figure it out? Contact us, we will be happy to help you complete the renovation specification.

 

"Renovation specification in 5 steps"